Jobs / United States / Personal data collected as part of the application process

Personal data collected as part of the application process

Tritium Process Engineers

Hybrid Posted today

View original listing ↗ Tailor my CV first Source: Arbeitnow

Listed on Arbeitnow: the application continues on their site, which links to the employer. Optional: we can tailor a CV and cover letter for this job from your real experience first (the first one is free).

Sponsorship verdict

No sponsorship evidence yet

No government record and no wording either way. Not a refusal: ask the recruiter.

  • No government sponsor record hereThis employer posted directly and does not match a government sponsor register.
  • The posting doesn’t mention sponsorshipSilence isn’t a refusal — ask the recruiter before investing much time.
  • No salary bar for this routeH-1B has no fixed salary bar: the employer must pay at least the prevailing wage for the role and area.
  • Confirmed live todayWhen a source last listed this job as open.
Details and sources
No salary bar for this route
H-1B has no fixed salary bar: the employer must pay at least the prevailing wage for the role and area. Cap-subject employers enter a lottery weighted by wage level. Source: https://www.federalregister.gov/documents/2025/12/29/2025-23853/weighted-selection-process-for-registrants-and-petitioners-seeking-to-file-cap-subject-h-1b, rules effective 2026-02-27.

US H-1B: cap-subject employers enter a lottery weighted by wage level — Level I gets 1 entry, Level IV gets 4 (DHS projected selection odds ≈15% at Level I to ≈61% at Level IV). Universities and non-profit research employers are cap-exempt. The $100,000 fee for new petitions from abroad is currently blocked by a court order (appeal pending).

A verdict summarises public evidence. It is not legal advice and never a guarantee: the employer and the immigration authority decide. Sign in to factor in where you can already work.

Before you apply

Sponsorship unknown

No register record and no sponsorship wording in the posting. Worth asking the employer before investing significant time.

These come from the posting’s own wording. Read the original listing to confirm. See better-fit alternatives →

About the role

About Tritium Fuel Cycle (TFC) GFG is designing a first-of-a-kind (FOAK) fusion power plant (FPP) to deliver 1 GW of electrical power in the 2040s. The “GIGA” plant will be based on a stellarator magnetic confinement fusion device, operating continuously on a deuterium-tritium (D-T) fuel cycle.  Prior to this, the smaller “Gauss Industrial Demonstrator (GID-170)” will be deployed in the mid-2030s. While deuterium can be extracted from seawater, tritium is a tightly controlled radioactive isotope with an extremely limited global supply. Therefore, both GID-170 and GIGA must utilise closed tritium fuel cycle infrastructure, to ensure that unburnt tritium is fully recycled back to the stellarator and not released to the environment. Meanwhile, the tritium consumed by the fusion reaction must be replenished using tritium breeding blankets (TBB). A first-of-a-kind dedicated tritium fuel cycle (TFC) facility, suitable for continuously supporting a stellarator device, must be designed, built and commissioned. It will adopt a multi-loop process architecture, each loop comprising many deeply integrated subsystems. Developing such a facility presents unique engineering challenges: the supply chain is still emerging, commercial process simulation tools lack dedicated TFC libraries, suitable off-the-shelf equipment is not always available, and some technologies have relatively low technology readiness levels (TRLs).  A conceptual design is currently under development, with the project then progressing into pre-front-end engineering design (pre-FEED) in 2028, followed by front-end engineering design (FEED) and design for manufacturing phases. Completion of the overall design phase (for GID-170) must be achieved by 2032. About the role GFG is looking for several Tritium Process Engineers to join the TFC department and develop the GID-170 and GIGA TFC facilities. The roles will contribute to the continued development and optimisation of the overall fuel cycle architecture and its subsystems. Activities will include managing design requirements; developing process flow diagrams (PFDs), piping and instrumentation diagrams (P&IDs), heat and mass balances (HMBs) and the Basis of Design (BoD); selecting technologies; sizing and arranging equipment; and contributing to safety-related design. The roles may also involve supporting equipment prototype development and testing with technology developers and research partners. We welcome candidates with complementary strengths in process design and process modelling and simulation, with systems engineering experience also desirable. These specialisations sit within the same engineering function, and candidates are not expected to have equal expertise across all areas. The number of appointments and balance of responsibilities will reflect the successful candidates’ experience and technical strengths. Drawing on their specialist expertise, successful candidates will work collaboratively on design development, modelling, analysis and optimisation to assess design alternatives and inform robust, well-documented design decisions. The TFC comprises a wide range of technologies and subsystems, requiring the department to manage multiple sub-projects and work packages in parallel. Each engineer will contribute across several activities and will be expected to take ownership of specific tasks or subsystems, or lead work packages, depending on their experience. The roles will involve close collaboration with engineers from the same and other disciplines at national and international partner organisations, research institutions and suppliers, as well as with colleagues across disciplines and departments within GFG. Given the specific challenges associated with tritium, close collaboration with Nuclear Safety and

View original listing ↗

Join us on Telegram