Sponsorship verdict
No sponsorship evidence yet
No government record and no wording either way. Not a refusal: ask the recruiter.
-
?
No government sponsor record hereThis employer posted directly and does not match a government sponsor register.
-
?
The posting doesn’t mention sponsorshipSilence isn’t a refusal — ask the recruiter before investing much time.
-
?
Can’t check pay against the visa rulesNo salary stated. Ireland Critical Skills Employment Permit needs at least €40,904 a year (General Employment Permit: €36,605).
-
✓
Confirmed live todayWhen a source last listed this job as open.
Details and sources
- Can’t check pay against the visa rules
- No salary stated. Ireland Critical Skills Employment Permit needs at least €40,904 a year (General Employment Permit: €36,605). Source: https://enterprise.gov.ie/en/what-we-do/workplace-and-skills/employment-permits/permit-types/critical-skills-employment-permit/, rules effective 2026-03-01.
A verdict summarises public evidence. It is not legal advice and never a guarantee: the employer and the immigration authority decide. Sign in to factor in where you can already work.
Before you apply
Sponsorship unknown
No register record and no sponsorship wording in the posting. Worth asking the employer before investing significant time.
These come from the posting’s own wording. Read the original listing to confirm. See better-fit alternatives →
About the role
In order to work in Ireland a non-EEA National, unless they are exempted, must hold a valid employment permit. Please review the Eligibility and requirements for an employment permit if you are unsure of your eligibility to apply for this vacancy.
This role is predominately site based in the Munster area, reporting into the regional office in Cork.
For for the initial phase you will be based on the Eli Lilly Limerick site for the next 6 to 8 months.
You will be dedicated to delivering electrical installations for the Irish, and UK, water and wastewater sectors, both municipal and industrial. In this role you will be reporting to the relevant Project Manager or Electrical Department Manager) depending on the project) and will be responsible for all elements of the electrical installation and delivery for, greenfield design and build, or brownfield refurbishment of water and wastewater treatment plants and associated equipment. Prior to design completion you will assess designs for constructability and completeness.
Due the continuous expansion of Glanua you may also be required to work on designs or delivery for other related industries.
In this role you will actively promote and advocate the culture and ethos of Glanua and leverage on its unique solutions based and design focus to deliver innovative, sustainable and efficient design to the market.
You will work in a one-team culture while actively contributing to your own skills and experience. In this role, you will provide technical expertise in the implementation of the Electrical Design and Construction.
Main Duties and Responsibilities:
The main duties and responsibilities of the Project Manager (Electrical) are outlined as follows:
· Work as part of a team in the delivery of one or more projects at any one time, embracing the ethos of a “one team” culture.
· Ensure Health, Safety, Environmental & Sustainability standards, policies and procedures are always adhered to on-site.
· Be familiar with the HSQE management system and procedures in conjunction with the current statutory requirements
· Work on assigned projects to manage the delivery of the electrical and installation scope including design and procurement elements; installation supervision, commissioning and handover.
· In conjunction with an electrical design engineer, design works include the compilation and review of M&I Listings, general services design, cable sizing/cable schedules, review I/O of listings, review of control panel drawings schematics, MIC load calculations, generator sizing/review, MV design review, etc.
· Procurement of packages such as control panels, automation hardware/software, starters, electrical installation works, MV works and lightning protection.
· Need to be familiar with programme and budgets for the project, fully understanding the impact any overruns shall have on the project
· Ensure project is delivered in-line with quality procedures and that all Factory Acceptance testing (FAT), site acceptance testing (SAT), inspection and test records (ITRs), insulation resistance checks, I/O point-to-point checks, rotation checks and commissioning of the works are completed in-line with the quality plan
Apply on company site ↗